Now we are approved

To do:

  1. Get the engineer to tell us everything that is wrong with the buildings and hope that nothing is too expensive to fix
  2. Decide where to put all the stuff – kitchen layout, basically
  3. Draw up plans for building the above two things
  4. Get a building permit (which involves a management plan)
  5. Figure out how much it will cost to do everything on the plans
  6. Find the money
  7. Hire the trades
  8. Build it and buy all the new stuff
  9. Move all the equipment in and test it
  10. Order in the stock and prep up

The above ten steps are much simplified, but that is pretty much what we are going to be doing for the next 4 months(ish). The goal is to be up and running by August 2020.